Collaborative Reporting for Safer Structures: CROSS-UK Newsletter 61

Author: Collaborative Reporting for Safer Structures

Date published

4 May 2021

Price
Free
The Institution of Structural Engineers The Institution of Structural Engineers
Back to Previous

Collaborative Reporting for Safer Structures: CROSS-UK Newsletter 61

Tag
Author
Collaborative Reporting for Safer Structures
Date published
4 May 2021
Price
Free
The Structural Engineer
Author

Collaborative Reporting for Safer Structures

Citation

The Structural Engineer, Volume 99, Issue 5, 2021, Page(s) 22-23

Date published

4 May 2021

Author

Collaborative Reporting for Safer Structures

Citation

The Structural Engineer, Volume 99, Issue 5, 2021, Page(s) 22-23

Price

Free

This month we highlight a report raising concerns about the fire safety of multistorey buildings comprising cross-laminated timber structures and the risk of collapse in the event of an uncontrolled fire.

Additional information

Format:
PDF
Pages:
22-23
Publisher:
The Institution of Structural Engineers

Tags

Timber Safety Professional Guidance Issue 5

Related Resources & Events

The Structural Engineer
Image showing up close deterioration of oriented strand board

CROSS Safety Report: Durability issues with engineered timber

This month's report concerns durability issues with engineered timber due to water ingress or condensation issues. Engineered timber appears to disintegrate more quickly than conventional timber, resulting in structural failure rather than distortion.

Date – 1 July 2024
Author – Collaborative Reporting for Safer Structures
Price – £0
The Structural Engineer
CROSS logo

CROSS Safety Report: Water ingress to cross-laminated timber structural frame

This month's CROSS report concerns water ingress that caused parts of the cross-laminated timber (CLT) structural frame of an eight-year-old building to rot.

Date – 2 May 2023
Author – Collaborative Reporting for Safer Structures
Price – £0
The Structural Engineer
Illustration of damaged ply boarding

CROSS: Rotting plywood decking on grandstand

As the summer event season gets under way in the UK, we present a CROSS safety report highlighting the need for robust inspections of temporary demountable structures.

Date – 1 July 2022
Author – Confidential Reporting on Safer Structures
Price – £0