CROSS newsletter no. 53: method statements on domestic projects

Author: Confidential Reporting on Safer Structures

Date published

1 February 2019

Price

Standard: £10 + VAT
Members/Subscribers: Free

The Institution of Structural Engineers The Institution of Structural Engineers
Back to Previous

CROSS newsletter no. 53: method statements on domestic projects

Tag
Author
Confidential Reporting on Safer Structures
Date published
1 February 2019
Price

Standard: £10 + VAT
Members/Subscribers: Free

The Structural Engineer
Author

Confidential Reporting on Safer Structures

Citation

The Structural Engineer, Volume 97, Issue 2, 2019, Page(s) 1

Date published

1 February 2019

Author

Confidential Reporting on Safer Structures

Citation

The Structural Engineer, Volume 97, Issue 2, 2019, Page(s) 1

Price

Standard: £10 + VAT
Members/Subscribers: Free

In this article, we highlight a report from CROSS newsletter No. 53, on the lack of method statements on domestic projects.

Additional information

Format:
PDF
Pages:
1
Publisher:
The Institution of Structural Engineers

Tags

Professional Guidance Issue 2

Related Resources & Events

The Structural Engineer
<h4>SCOSS Alert: Effects of scale</h4>

SCOSS Alert: Effects of scale

This article from Structural-Safety summarises the latest SCOSS Alert addressing effects of scale.

Date – 1 February 2019
Author – Structural Safety
Price – £10
The Structural Engineer
<h4>The Drawing Board (February 2019)</h4>

The Drawing Board (February 2019)

This month Ron Slade has selected a sketch of Daly's Bridge by John Gamble, a Design Engineer for RPS in Ireland. John receives an e-book of his choice from the Institution’s current catalogue.

Date – 1 February 2019
Author – Ron Slade
Price – £10
The Structural Engineer
<h4>Spotlight on Structures (February 2019)</h4>

Spotlight on Structures (February 2019)

In this section we shine a spotlight on papers recently published in Structures – the Research Journal of The Institution of Structural Engineers. This month, Editor-in-Chief, Professor Leroy Gardner, presents a featured article on 'Finite Element Modeling and design of Single Angle Member Under Bi-axial Bending'.

Date – 1 February 2019
Author – Various
Price – Free